Skin Co Labs

The Objective

  • full office and warehouse rip out within 6 weeks

  • mention the clean room - what had to be done and why

  • warehouse -

  • offices.

Timeline

Rip out.

During the first week, the team came in, cleared out all the remaining items left by the previous owner, tidied the space, and began ripping out the old equipment in preparation for the building work to begin.

Build Up.

What was once a dusty old warehouse needed to be transformed into a clean, purpose-built room suitable for cosmetic production. To achieve this, an extension was required to allow finished goods to be transferred directly into the warehouse for dispatch, without any risk of contamination.

During week two, the team focused on constructing this extension and began re-wiring the building in preparation for the installation of new lighting and electrical systems.

Build Up Continues…

With the transition room underway, the old canteen needed some serious TLC. We knocked through and built up from scratch a new canteen that could be entered from the clean room & the warehouse.

Plastering was complete, ready for paints, panels, doors and flooring.

Health & Safety requirements

Clean room walls and flooring went down, ensuring all wipeable surfaces, meeting all health and safety requirements. Brand new shutters installed between the warehouse & clean room.

Bringing the Space to Life

During the penultimate week, the team were working on bringing the space to life, painting, laying the brand new floors, installing the brand new kitchen and canteen.

The live moss wall arrived and was installed with the neon sign!

Magic

The final week was were the magic came to life. The furniture that was carefully selected for this space was installed, and the final touches were made, turning this once empty warehouse into a modern, stylish office space with a clean production and warehouse area.

Project progress image

MD’s Office

Moss Wall

Information about said moss wall - why have this?

real moss - pannelling